Quality workflow

Traceability starts at intake.

Quality requirements are treated as part of the job definition. Revision, material, inspection, and shipment records stay tied to the same work reference.

01

Document review

Part number, drawing revision, model, material, quantity, and delivery requirement are compared before release.

02

Job traveller

Operations, inspection points, and required records are carried with the work.

03

In-process checks

Critical dimensions and setup-sensitive features are checked before the final operation.

04

Shipment match

Final documentation is matched to the purchase order and drawing revision.

Next step

Need supplier requirements?

Download the drawing checklist and RFQ cover sheet from supplier resources.

Supplier resources